R.E. No. 24,

Kowloon Canton Railway.

BRITISH SECTION.

ESTIMATE.

92

Main Head.

Bridges.

Sub. Head.

Major Bridge No.45.

Work

Three 20' Girders at chain 102′′ 400

Drawing C.R.E. No.238B1.


Quantity DESCRIPTION Rate Unit AMOUNT 48,400 Excavation in founda. 10/- % oft 484.00 Timbering and punching. 1,000 00 1,000.00 10,480 Concrete in founds. 35/- % oft 3,668.00 13,180 Masonry in superstructure 40/- % oft 5,272.00 370 Masonry in coping and Bedstones 2/- 0. It 740.00 1,280 Dry stone backing 10/- % oft 128.00 3 Spans 20' Girders 500/- each 1,500.00 erection and painting. 100/- 300.00 Total 12,976.80 Contingencies 10% 1,297.68 Grand Total 14,274.48

Edit History

2026-06-04 21:21:49 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
R.E. No. 24, Kowloon Canton Railway. BRITISH SECTION. ESTIMATE. 92 Main Head. Bridges. Sub. Head. Major Bridge No.45. Work Three 20' Girders at chain 102′′ 400 Drawing C.R.E. No.238B1. Quantity DESCRIPTION Rate Unit AMOUNT 48,400 Excavation in founda. 10/- % oft 484.00 Timbering and punching. 1,000 00 1,000.00 10,480 Concrete in founds. 35/- % oft 3,668.00 13,180 Masonry in superstructure 40/- % oft 5,272.00 370 Masonry in coping and Bedstones 2/- 0. It 740.00 1,280 Dry stone backing 10/- % oft 128.00 3 Spans 20' Girders 500/- each 1,500.00 erection and painting. 100/- 300.00 Total 12,976.80 Contingencies 10% 1,297.68 Grand Total 14,274.48
Baseline (Original)
:{ UNWARA HOÌnno noolwof AI MORFO32 AZITIЯ8 31AMIT 23 R.E. No. 24, Kowloon Canton Railway. BRITISH SECTION. ESTIMATE. 92 Main Head. Bridges. Sub. Head. Major Bridge No.45. Work Three 20' Girders at ohain 102′′ 400 Drawing C.R.E. No.238B1. AMOUNT. antity. DESCRIPTION. Rate. Tuit. * Cts. 48, 400 Excavation in founda. 10/- % oft 484 Item Timbering and punging. 1,000 00 C 10,480 Conerete in founds. 35/- foft 3,668 00 13,180 Masonry in superstructure 40/- % ort 5,272 00 2 370 Masonry in coping and Bedstones 2/- 0. It 740 0 - 1,280 Dry stone backing 10/- % oft 3 Spans 20' Girders 500/- each erection and painting. 100/ # 12 1,500 00 300 00 8 8 8 8 8 8 8 8 00 80 Total takt Contingincies 10% Grand Total 12,976 1,297 80 68 14,274 | 48
2026-06-04 21:21:49 · Baseline
View content

:{

UNWARA HOÌnno noolwof

AI

MORFO32

AZITIЯ8

31AMIT 23

R.E. No. 24,

Kowloon Canton Railway.

BRITISH SECTION.

ESTIMATE.

92

Main Head.

Bridges.

Sub. Head.

Major Bridge No.45.

Work

Three 20' Girders at ohain 102′′ 400

Drawing C.R.E. No.238B1.

AMOUNT.

antity.

DESCRIPTION.

Rate. Tuit.

*

Cts.

48, 400

Excavation in founda.

10/- % oft

484

Item Timbering and punging.

1,000 00

C

10,480 Conerete in founds.

35/- foft

3,668 00

13,180 Masonry in superstructure

40/- % ort

5,272 00

2

370

Masonry in coping and Bedstones

2/- 0. It

740

0

-

1,280 Dry stone backing

10/- % oft

3

Spans 20' Girders

500/- each

erection and painting.

100/

#

12

1,500 00

300 00

8 8 8 8 8 8 8 8

00

80

Total

takt

Contingincies 10%

Grand Total

12,976

1,297

80

68

14,274 | 48

Comments